The usual meetings at 16:00 UTC have been held in #core-themes on Monday and Fridays. There was a slightly longer meeting this week to work through issues and pull requests.

Twenty Sixteen looks good for a merge to core at the end of the month. We have 10 issues with most having pull request or actions associated with them.

There is one pull request that will be added right before core merge. This is due to our sync. Once the theme is merged to core we will be changing the minimum version required to reflect that.

The accessibility team have done their tests and reported back. Each point is now going to be worked through and issues raised as they come up. Thanks for doing the tests!

Everything seems to be on track! A big thanks to everyone that has worked to get Twenty Sixteen in such good shape, so fast.